Dubai Mall, Dubai UAE

World’s largest shopping and entertainment destination

BUSINESS BAY EXECUTIVE TOWERS

Mechanical

  • 16 Nos. x 2200 TR Chillers
  • 9 Nos. Condenser water pumps (6,600GPM)
  • 7 Nos. CHW secondary pumps (9900GPM)
  • 1 No. CHW filtration system (400GPM)
  • 1 No. CHW Expansion Tank (21,133 Gallons)
  • 9 Nos. Cooling towers 4,400TR & 10,000GPM
  • 9 Nos. Cooling tower basin filtration (1,700GPM)
  • 2 Nos. Air copressors with Air Drier
  • 9 Nos. Make up water pumps


  • 2 Nos. Air Separator
  • Chemical Dosing System
  • Fuel Oil System
  • 3 Nos. Chilled Water Pumps for Inplant
  • 13 Nos. Air Handling Units
  • 2 Nos. Fresh Air Handling Units
  • 5 Nos. Fan Coil Units
  • 13 Nos. Exhaust Fans
  • 2 Nos. Staircase Pressurization Fans


Electrical

  • 7 Nos. 11KV Switchgears
  • 16 Nos. 3.3.KV Switchgears
  • 16 Nos. 11/3.3KV, 2500 KVA Transformers
  • 32 Nos. 3.3KV Soft Starter for chillers & Pumps
  • 7 Nos. 3.3KV/400V, 750KVA Transformers
  • 9 NOs. 3.3KV/400V, 150KVA Transformers
  • 7 Nos. 522KW VFD Panels for Secondary Pumps
  • 3 Nos. 400KV Main Distribution Board
  • 1 No. 1500KVA Diesel Generator Set
  • 6 Nos. Motor Control Centers


Fire Fighting System

  • Jockey Pump – 45GPM
  • Electric Pump – 1,500GPM
  • Diesel Pump – 1,500GPM
  • FM 200 Fire Extinguishing system
  • 2 Nos. Foam system
  • 9 Nos. Deluge system


DUBAI MALL

Project Highlights
  • Electrical
  • Conventional Chillers
  • Glycol Chillers
  • chiller Bay
  • 12 Nos. x 3900 TR each Cooling Towers
  • 2 Nos. x 20,000 TR Thermal Storage Tank
  • 8 Nos. Condenser Water pumps
  • 12 Nos. Condenser Filtration System
  • 7 Nos.Air Handling Units
  • 4 Nos. Fan Coil Units
  • 11 Nos. Extract Fans
  • 5 Nos. Supply Fans
  • 33 Nos. VFDs


  • CHW Pressuirzation Unit
  • Glycol Feed Unit
  • 1 No. Fire Pump ATS Panel
  • Fuel Oil System
  • Booster pumps
  • FM 200 System
  • Fire Pumps
  • Make up pumps
  • Sump pumps
  • Chemical Dosing System
  • CHW side stream filtration unit
  • Glycol side stream filtration unit


IBN BATUTA SHOPPING MALL

Project Highlights

  • 6 Nos. X 2500 TR Capacity (3.3 kV)
  • 6 Nos. Primary CHW pumpsets
  • 6 Nos. Secondary CHW Pump sets
  • 6 Nos. Condenser water pumpsets
  • 6 Nos. Cooling Towers
  • 2 Nos. Air Separators
  • 4 Nos. Expansion Tanks
  • 12 Nos. VFDS
  • Automatic Chemical Dosing System
  • Cooling Tower Make up water pumps
  • Potable Water
    • 6 KM of Burried CHW piping with leak detection system
    • 600 Meters of Pipe lines inside plant room
    • 3 Nos. 6000 kVA Transformers & 4 Nos.
    • 2000 kVA transformers
    • HV Switchgear
    • LT Panels & Switchgear
    • Fire Alarm,Fire Fighting & FM 200 System
    • Integrated Building Management System
    • Lighting and Power Distribution System
    • Emergency Lighting System
    • Fire Water and LPG System
    • Complete Civil works for Plant room


    Jebel Ali District Cooling facility, UAE

    Project Highlights

    • 10 cooling towers and 5 air separators
    • Primary & Secondary CHW pumps and condenser water pump & piping network
    • Over 30 Kms of buried insulated chilled water piping with Leak Detection System
    • Over 60 Kms of Chilled Water Piping Network in a single project
    • Power distribution system including lighting system and emergency power services
    • 100,000 tons of refrigeration in a single project
    • 50 Chillers each with a capacity of 2000 TR
    • 12 transformers each with a capacity of 2500 KW
    • Site Stream Filtration System
    • Chemical and Acid Dosing Systems
    • 18m high Cooling Tower makeup water tank
    • SCADA systems, Fire Alarm and fire fighting system


    JUMEIRAH ISLANDS

    Project Highlights

    • 4 Nos. X 2250 TR Capacity
    • 8 Nos. Primary CHW Pumpsets
    • 8 Nos. Secondary CHW Pumpsets
    • 8 Nos. Cooling Towers
    • 2 Nos. Air Separators
    • 4 Nos. Expansion Tanks
    • 16 Nos. VFDS
    • Automatic Chemical Dosing System
    • Cooling Tower Make up water pumps
    • 60 KM of Burried CHW piping with leak detection system
    • 600 Meters of Pipe lines inside plant room

    • 8 Nos. 2000 kVA Transformers
    • HV Switchgear
    • LT Panels & Switchgear
    • Fire Alarm,Fire Fighting & FM 200 System
    • Integrated Building Management System
    • Lighting and Power Distribution System
    • Emergency Lighting System
    • Integrated Building Management System
    • Lighting and Power Distribution System
    • Emergency Lighting System
    • Potable Water


    MALL OF THE EMIRATES

    Project Highlights
    • 13 Nos. x 1150 TR Capacity WCM with auto cleaning System
    • 8 Nos. Primary Chilled Water Pumps
    • 10 Nos. Condenser water pumps
    • 12 Nos. Cooling Towers
    • 5 Nos. Sand Separators
    • 1 No. Pressurization Unit
    • Automatic Chemical dosing system
    • 3 Nos. Cooling Tower Make up water pumps
    • Automatic tube cleaning system for Chillers

    • GRP Piping for Condenser Water
    • 4 KM of Buried CHW piping with leak detection system
    • Fire Pumpset
    • Domestic water transfer & booster pumpsets
    • Water filtration set incl.multimedia & carbon filters
    • 2.2 Km high density polyethylene buried pipes for water services and Fire Fighting
    • 94MW LV connected load from 85 Nos. 1500 kVA Transformer
    • Fire Alarm & Fire Fighting System
    • Emergency Lighting System


    THE GARDENS

    Project Highlights
    • 31 Kilometers of buried insulated chilled water piping with Leak Detection System
    • 13 nos. chillers each of 1300 TR Capacity totaling to 16,900 TR Capacity
    • 13 nos. Primary Chilled Water pump-sets
    • 10 nos. Secondary Chilled Water Distribution Pump-sets with VFD
    • 13 nos. Condenser Water Pump-sets
    • 13 nos. Cooling Towers
    • 13 nos. Sediment Separators
    • 13 nos. 2000 KVA Transformers
    • HT Switch-gears
    • LT Panels and Switch-gears


    • 4 nos. Expansion Tanks.
    • 2 nos. Air Separators
    • Chemical Dosing System
    • Fire Alarm & Fire Fighting System
    • Supervisory Control And Data Acquisition System (SCADA) for Plant room
    • 2 Sets of Water Ozone System for Condenser Water Purification
    • Power Distribution System
    • Emergency Power Distribution System
    • Lighting Systems
    • Emergency Lighting System
    • Cooling Tower make up pumping system


    WAFI CITY CENTRE

    Project Highlights
    • 8100 TR Capacity Chiller Plant
    • 4nos. Primary CHW Pumpsets
    • 4nos. Secondary CHW Pumpsets
    • 4nos. Condenser water Pumpsets
    • 5nos. Cooling Towers
    • 2nos. Air separators
    • 1 no. Expansion Tank
    • 4nos. VFDS
    • Automatic Chemical Dosing System
    • Cooling Tower Make up water pump system
    • 4500 TR Energy Transfer Stations in Hotel

    • Sump Sweeper System
    • Refrigerant Monitoring System
    • Refrigerant Recovery System
    • 6nos. 11/0.4 kV & 11/3.3 kV Transformers
    • MV Switchgear
    • LV Panels & Switchgear
    • Fire Alarm & Fire Fighting System
    • Integrated Building Management System
    • Lighting and Power Distribution System
    • Emergency Lighting System
    • Portable Water