CLEVELAND CLINIC

Project Highlights

• 25000 tons of refrigeration with 149 AHUs & 426 fan coil units and electrical connected load of 63 MW installed at site
• Full scale of services like Medical Gas, Instrument Air, Medical Vacuum & Lab Gas provided
• 1.5 Km of underground piping and 6 Km of other piping works across buildings
• Over 150 Km of HV equipment & fire device cabling
• 52000 smoke detectors & annunciator panel installed
• Innovative solutions like Fan Wall Technology and Multiple Redundancy Techniques used for critical medical facilities


Dubai Health Care City

Project Highlights
  • 4 Nos. Fresh Air Handling Units
  • 10 Nos. Recirculating Air Handling Units
  • 12 Nos. Secondary Chilled Water Pumps
  • 534 Nos. Fan-Powered Variable Air Volume Units
  • 55 Nos. Fan Coil Units
  • 5 Nos. Carpark Extract Fans
  • 1 Set Main Water Transfer Pumps
  • 4 Nos. GRP Water Tanks
  • 10 Sets Water Booster Pumps
  • 1 Set Fire Pumps, Jockey, Main Electric and Diesel
  • 6 Nos. Main Distribution Boards
  • 1 No. 1500 kva Generator
  • Building and Façade Lighting System
  • Lighting Control System
  • Fire Alarm System
  • Central Battery Emergency Lighting System
  • Building Management System

HATTA HOSPITAL

Project Highlights – Air Conditioning
  • Supply
  • Installation
  • Testing and commissioning of 300 TR Chillers capacity
  • 14 Nos. FCUs
  • 85 Nos. FCUs
  • Chilled water Pumps
  • 260 Nos. VAVS and other associated air conditioning works

INTEGRATED HEALTH CENTER & WORKERS HOSPITAL

Project Description: This Project is located in Raslaffan . The Project Built-up area is (Approx.) 185,000 m2 Five floors consisting of Basement, Ground, First, second and third floor.
PM & Consultant: M/ s. Dar Al Handasa
Main Contractor: M/s. Qatari Arabian Contracting Co.
Approximate subcontractor value (MEP): QR 235 Million


Kalba Hospital

Project Highlights
  • 4 x 360 TR Capacity Chillers
  • 26 Nos. Air Handling Units
  • 104 Nos. of Fan Coil Units
  • More than 35 KM of piping
  • 20, 000 sq. mtrs of ducting
  • 5, 560 KW -total connected electrical load
  • 11 Nos. Sub Main Distribution Boards
  • 73 Nos. Distribution Boards
  • 3,410 Nos. of Light Fixtures
  • 60 KM of conduiting
  • 23 KM of cabling
  • BMS System with more than 800 points

KHUBCHANDANI HOSPITAL

Owner: Khubchandani
Main Contractor: Khubchandani Hospital Pvt.
Contract value: INR 22 Crores
Project Start Date: Sep 2011.
Scope: HVAC


NEO PHARMA

M & E Abu Dhabi have successfully completed HVAC and Clean Rooms works for a Pharmaceutical Plant for M/s. Neo Pharma. The plant is built with State-of-art technology to produce antibiotic bulk drugs and tablets.

Client: M/s. Neo Pharma LLC

Consultant: WS Atkins


  • Sheikh Khalifa Hospital Plant Room
  • Sheikh Khalifa Hospital Plant Room
  • Sheikh Khalifa Hospital Plant Room
  • Sheikh Khalifa Hospital Plant Room
  • Sheikh Khalifa Hospital Plant Room
  • Sheikh Khalifa Hospital Plant Room
  • Sheikh Khalifa Hospital Plant Room
  • Sheikh Khalifa Hospital Plant Room
  • Sheikh Khalifa Hospital Plant Room

Sheikh Khalifa Specialist Hospital

The 248-bed, 699,700 sq ft Sheikh Khalifa Specialist Hospital in Ras Al Khaimah, UAE, is expected to be the state-of-the-art medical facility in the area. Dhs.555 Million health facilities is part of President H H Sheikh Khalifa bin Zayed Al Nahyan’s support for development of infrastructure in remote regions in the UAE.

ETA has carried out complete state-of-the-art Electromechanical works and Building Management System as per International Standards.