Emirates Palace, Abu Dhabi

International architectural marvel set upon one million square meters

AJMAN KEMPINSKI

Project Highlights

Owner: H.H. Sheikh Humaid Bin Rashid Al Nuami, The Ruler of Ajman
Operators: Bhatia Brothers
Consultants: M/s. M. Moez & H. Higazy
Main Contractor: M/s. Unity Contracting Co. (UNCO) Ltd
Built Up Area: 35,000 Sq.mtrs. (376,000 Sq.ft.)
Const. Detail: B+ G + 2 Floors + 6 Typical Floors
AC Load (chiller Cap):
Public Areas Is 1250 Tr (5 Nos. X 250 Tr)
Typical Floors 546 Tr (3 Nos. X 182 Tr)
All Chillers Are Placed On The Second Floor Roof Above The Service Area.
Elec. Details: We Are Providing 4 Nos. X 1500 Kva Transformers 11kv/433 V Connected Load Is 4440 Kw. Standby Generator Of Capacity 800 Kva Is Provided.
Add. Details: We Are Also Providing 3 Nos. X 625 Kg/hr. Steam Boiler. The Steam Generated Is Used For Domestic Hot Water And In The Laundry.


AL BUSTAN HOTEL

Project Highlights

Client: H.H. Sheikh Hamdan Bin Rashid Al Maktoum
Consultant: M/s. Khatib & Alami
Main Contractor: M/s. Al Nekhreh Contracting Co.
Scope of works: Complete MEP works
Date of Completion: July 97
Job Statistics:
Plot Size: 30,000 sqm
Floors: B+G+4 Storey
Chillers: 1800 TR
AHUs/FCUs: 392 Nos
Galvanised Ducting: 250,000 Sq ft
Lighting Fixtures: 7000 Nos
Sprinklers: 4000 Nos


AL HABTOOR RESORT & SPA

Project Highlights
  • LPG/Fuel System
  • Deluge / Pre-Action System
  • MATV/FA & VA Systems
  • Co – Monitoring / FM 200 System
  • Aircraft Warning Lighting
  • Emergency Lighting

CAPITAL GATE

Project Highlights

AIR CONDITIONING

  • 7 Nos. Chilled Water Pumps
  • 2 Nos. Heat Exchangers
  • 17 Nos. AHUs & 619 Nos. FCUs
  • 4 Nos. Indoor Air Quality Equipment
  • 10,400 sq. mtr Pre-insulated Ducts
  • 1,050 sq. mtr. MS Duct
  • 21,000 sq. mtr. GI Ducting

ELECTRICAL

  • 1 No. 11kv Switchgear
  • 5 Nos. 1500Kva Transformers
  • 6 Nos. MDBs, 9 Nos. MCCs
  • 1 No. 1250Kva Diesel Generator
  • 31 Nos. Dimmer Racks for Intelligent Lighting
  • Lighting Control System
  • Fire Alarm /Voice Evacuation System
  • Structured Cabling System
  • Central Battery Emergency Lighting System
  • Building Management System
  • CCTV System

PLUMBING/DRAINAGE/FIRE FIGHTING

  • 12 Sets Pumps
  • 8 Nos. Hot Water Calorifiers
  • 2 Nos. Heat Exchangers
  • 4 Nos. GRP Water Tanks
  • 6,000 Mtr. Hot Water Heat Tracing Cables
  • 2 Sets Sump Pumps
  • 47 Nos. SS Trench Drains for Kitchen
  • Fire Pumps to NFPA Standard
  • FM200 System

EMIRATES PALACE

Project Highlights

• 10 substations in a single project
• Over 700 tons of Duct work • 1.8 million metres of cable works
• Over 750 Kms of IT cabling • 140 Nos Air Handling Units
• Over 55,000 light fixtures • Over 150 Kms of Hot & Cold Water Piping
• Over 27,000 sprinkler heads
• 18 chillers of 8000 TR
• 140 Kms of fire fighting production piping and over 38 Kms of Cold Cathode Lighting
• 10 substations in a single project
• Over 700 tons of Duct work
• 1.8 million metres of cable works
• Over 750 Kms of IT cabling
• 140 Nos Air Handling Units
• Over 55,000 light fixtures
• Over 150 Kms of Hot & Cold Water Piping
• Over 27,000 sprinkler heads
• 18 chillers of 8000 TR • 140 Kms of fire fighting production piping and over 38 Kms of Cold Cathode Lighting


EMIRATES TOWERS HOTEL

Project Highlights
  • HVAC System including chiller compound
  • Fire Fighting System
  • Drainage System
  • Domestic Water Supply System
  • Power Distribution System
  • Emergency Power Distribution System
  • Lighting, Lighting Control & Dimming System
  • Fire Alarm / PAVA / Fire Telephone System
  • Central Alarm & Control facility
  • Smoke Extract & Pressurisation System
  • LPG Supply & Leak Detection System
  • FM 200 Fire Detection and Extinguisher System
  • Emergency Lighting System
  • High Performance Music System

  • Structured Cabling & Networking System
  • Building Management System
  • Closed Circuit Television System
  • PABX System
  • Video on Demand System
  • Interactive TV System
  • Staff Paging System
  • Earthing & Lightning Protection System
  • Kitchen Equipment & Services
  • Laundry & Services
  • Water fall and water features


FORTE GRAND

Project Highlights
  • Air Conditioning, electrical, plumbing & drainage works.
  • Building management system.
  • Fire alarm System.
  • Sprinkler System.
  • Fountains.
  • Centralised LPG system for kitchens.
  • Centralised TV, music and public address system.
  • Filtration system.
  • Cabling for micros and cara’host system.
  • Uninterrupted power supply system.

KHALIDIYA PALACE ROTANA

Project Highlights

Air Conditioning Work

  • 6,500 TR Air Cooled Screw Chillers
  • 41 Nos. FAHUs/AHUs
  • 2177 Nos. Fan Coil Units
  • 43 Nos. Chilled Water Pumps
  • 40 KM Chilled Water Piping
  • 125,000 Sq. Mtrs. of Ducting
  • Fire-rated ducts for sensitive areas
  • 77 Nos. Exhaust Fans
  • 17000 Nos. BMS Points

Electrical & ELV System

  • 22 Nos 11 kV/400 V Dry Type Transformer
  • 3000 Meters of Busbar Installations
  • 4 Nos. standby Generator (15,364 kw)
  • 3 Kilomters of HV Cables
  • 5 Nos. 11 kV Switchgear
  • 19 Nos. MDB
  • 149 Nos. SMDB and 1080 Nos. DB
  • 11 Kilometers of XLPE Cables
  • 42000 Nos. Switches & Sockets
  • 4500 Nos. Fire Detecting Device
  • 1165 Nos. Voice Evacuation Point
  • 49,000 Nos Light Fittings

AHU

  • 48 Nos. Central Battery Panel
  • 46 Nos. Lighting Control Panel
  • 11 Nos. Fire Alarm Panel

Plumbing & Fire Fighting System

  • 48 Kilometer Water Supply Pipes
  • 25 Kilometer Hot Water Supply Pipes
  • 31 Kilometers Fire Fighting Pipes
  • 1117 Nos. Water Heaters
  • 25 Sets Water Pumps
  • 3 Nos. Fire Pumps
  • 7000 Nos. Sprinklers

Specialised Equipments

  • 3 Nos. Steam Boilers
  • 6 Nos. Calorifiers
  • 2 Nos Water Filtration System
  • 2 Nos. Water Softner System
  • Swimming Pool & Water Fountain system
  • Centralized LPG System