Sumbe Cement Plant, Angola

EPC of 4200 tons per day cement plant

  • Aweer Power Plant
  • Aweer Power Plant
  • Aweer Power Plant

Aweer Power Plant

Project Highlights

• 4 X SGT 94.3 A Gas Turbines
• 4 X 3Ph, 50Hz 233/310MVA, 400/20kV Power Transformers
• 4 X 3Ph, 50Hz 18/24MVA, 20/6.6kV Aux Power Transformers
• 8 X TP 10/10 ATLAS COPCO, High pressure/High Speed Centrifugal Compressors with international Gas Treatment and Gas Processing Plant
• 3 X 13364 cum Fuel Oil Storage Tanks with Fuel Oil Treatment and 8 X 185 m3/hr Fuel Forwarding Pumps
• Commissioned in a record time of 18 months operating at a rated capacity of 818 MW
• Compressed Air, Emergency Diesel Generators, Station Services, Buildings, HV/LV Cabling and Switchgears and associated auxiliaries with DCS and BMS Systems


  • EMAL SMELTER COMPLEX
  • EMAL SMELTER COMPLEX
  • EMAL SMELTER COMPLEX

EMAL SMELTER COMPLEX

EPC Contract For Construction Of 2000 MW Combined Cycle Power Plant At EMAL Smelter Complex, Abu Dhabi

Project Highlights
  • 6 Nos. GE 9FA Gas Turbines
  • 2 Nos. of GE Make C7 STG
  • Electrical and Instrumentation Works
  • Piping – 50,000 Inch Dia

EPC OF WATER PROJECTS

3 MIGD Reverse Osmosis Desalination Plant At Ajman For FEWA

  • 3 x 1 MIGD BWRO Plant
  • Complete Balance of Plants
  • Construction of Complete Civil, Mechanical, Electrical & Instrumentation works

7.5 MIGD Reverse Osmosis Desalination Plant At Ras Al Khaimah, Fujairah And Ajman For FEWA

  • 5x 1.5 MIGD TVC MED Desalination Plant
  • 4 Nos. of HRSGs behind Frame 6 GTs
  • 2 Nos. of Oil Fired Auxiliary Boilers
  • Sea Water Intake Systems
  • Complete Balance of Plants
  • Construction of Complete Civil, Mechanical, Electrical & Instrumentation works

3 MIGD Reverse Osmosis Desalination Plant At Ajman For FEWA

  • 2x 1.5 MIGD TVC MED Desalination Plant
  • 1 No. of HRSG behind Frame 6 GTs
  • 1 No. of Oil Fired Auxiliary Boiler
  • Sea Water Intake Systems
  • Complete Balance of Plants
  • Construction of Complete Civil, Mechanical, Electrical & Instrumentation works

SCADA System Including Electro-mechanical Works For Complete Water Network in Dubai including Civil, Mechanical, Electrical, Instrumentation


  • JEBEL ALI POWER & DESALINATION PLANT
  • JEBEL ALI POWER & DESALINATION PLANT
  • JEBEL ALI POWER & DESALINATION PLANT

JEBEL ALI POWER & DESALINATION PLANT

Erection Of Auxiliary Boilers At Jebel Ali Power And Desalination Plant ‘l’ Phase-1, Dubai

Project Highlights
  • 2 Nos. of 550 TPH Auxiliary Boilers
  • Complete Electrical and Instrumentation

Solar Plant

ETA has carried out Design, Engineering, supply, installation and testing and commissioning of 9MWp Grid Interactive Solar Plant with associated equipment and materials on turnkey basis comprising the following:
34,783 PV Modules, 7100 Cadmium Telluride (Cd-Te) Modules
4,673 Amorphous Silicon (A-Si) Modules
9 Nos. 1.25 MVA 330-330v/11kv Transformers
18 Nos. 500kW 770 V DC/330 V AC inverters
1 Nos. 12.5 MVA 11 /66 kV Transformer
1 Nos. 400 KVA 11/0.415 kV Aux Transformer


  • SUMBE CEMENT PLANT
  • SUMBE CEMENT PLANT
  • SUMBE CEMENT PLANT

SUMBE CEMENT PLANT

Project Highlights

• 97,200 cum of Concrete Work and 240,000 cum of earth works
• 13500 MT of equipment erection and 9000 MT of structural erection
• 47,860 RM of Pipe Line Works
• 605,700 RM of cable laying and 66,000 RM of Cable Gallery/ Tray Erection
• Over 400 motors & drives
• 88,000 sq. m of sheeting
• All silos have being constructed using Slipform technology
• Over 20 Km of road network constructed from highway to plant and another 10 Km of inside plant network
• Erection of a single piece equipment weighing 140 MT
• Material lifted to over 130m using 440 T crane