Dubai Metro

World's longest automated driver free metro network

  • ETA Engineering - Bengaluru Metro
  • ETA Engineering - Bengaluru Metro
  • ETA Engineering - Bengaluru Metro

BANGALORE METRO

Project Highlights

Chennai Metro

Project Highlights

Since 2003, beginning with the Delhi Metro Rail Project Phase I, ETA Engineering, Delhi has secured a continuous flow of new contracts from Delhi Metro Rail Corporation (DMRC) for Delhi Metro Rail Projects.

Based on our excellent continued track record on Metro Rail Projects, ETA Engineering, Chennai has been awarded Chennai Metro Rail Project Phase 1 against stiff competition from the Global Bidders.

Delhi Metro Rail Corporation (DMRC) has been appointed as the Prime Consultants for Phase -1 of the Project. ETA has been maintaining a long and successful relationship with DMRC for being associated with them in their various packages of Delhi Metro Rail Projects for the past 8 years.

The scope of works includes Design, build, coordination, procurement, installation, testing and successful commissioning of Tunnel Ventilation System for 19 Under Ground Stations on Corridor 1 (Washermanpet – Chennai Central – Airport) & Corridor 2 (Chennai Central – Anna Nagar – St. Thomas Mount) and the tunnel length for Corridor 1 is 14.3 km and Corridor 2 is 9.695 km.

The tunnel ventilation system shall consists of Track way exhaust system including fans, dampers and steel duct works, interface of the SCADA and associated electrical power supply and distribution system.


  • ETA Engineering - Delhi Metro
  • ETA Engineering - Delhi Metro
  • ETA Engineering - Delhi Metro
  • ETA Engineering - Delhi Metro
  • ETA Engineering - Delhi Metro
  • ETA Engineering - Delhi Metro
  • ETA Engineering - Delhi Metro
  • ETA Engineering - Delhi Metro
  • ETA Engineering - Delhi Metro

Delhi Metro

Project Highlights
  • 10 Nos. X 420 TR Screw Chillers
  • 26 Nos. Pumps
  • 9 Nos. Cooling Towers
  • 4 Nos. Automatic Dosing System
  • 28 No. Air Handling Units
  • 60 Nos. Fan Coil Units
  • 104 Nos. Split Units
  • 11 Kilometer of Piping
  • 41,000 Sq.Mtrs of ducting
  • Fire rated ducts (250 degree Celsius for 2 hours) for sensitive areas.

Dubai Mono Rail

Project Highlights

Client: M/s Nakheel
Description: Supply, install, test & commission air conditioning and ventilation, electrical and fire alarm, plumbing, drainage & fire fighting works etc for 4 Stations viz. Atlantis Station, Trump Tower, Trump Plaza, Gateway Stations (in JV with Hitachi Plant)
Consultant: M/s Systra
Main Contractor: Marubeni Corporation
Civil Contractor: PJMC – Palm Jumeirah Monorail Civil JV


  • ETA Engineering - Dubai Metro
  • ETA Engineering - Dubai Metro
  • ETA Engineering - Dubai Metro
  • ETA Engineering - Dubai Metro
  • ETA Engineering - Dubai Metro
  • ETA Engineering - Dubai Metro

Dubai Metro

Project Highlights

• First of its kind in the region
• Longest automated (driver free) Metro Rail – 75 Km, including 12.6 Km underground
• Electro-mechanical works for 47 stations including 10 underground stations
• State of the art Tunnel Ventilation Systems
• Reversible Smoke Extract fans and tunnel fans
• Sophisticated Mode Driven Building Management System
• Worldís Best Firefighting and Automation System for passenger safety
• Operational Control Centre to control driver free operation and firefighting system
• Special Fire Alarm System


  • ETA-Mumbai-Metro-1
  • ETA-Mumbai-Metro-2
  • ETA-Mumbai-Metro-3

MUMBAI METRO

Owner : MMOPL
Contract value : INR 82 Crores
Project Start Date : Jan 2011
Special Feature : Mumbai’s First Metro Rail Service
Scope : Depot MEP Services

  • Air-conditioning
  • Ventilation
  • Electrical System
  • Plumbing System
  • Fire Fighting System
  • HVAC Chiller Plants & Systems
  • Ventilation Systems
  • Precision Air Conditioning Systems
  • Main & Other LT Panel (Electrical Panel)
  • Diesel Generator Set & System
  • Earthing & Lighting Protection System
  • Street Light System & High Mast System
  • Uninterruptible Power Supply System
  • Plumbing Pumps & Systems
  • Rainwater Harvesting Systems
  • Water Treatment Plants & Systems
  • Fire Fighting Pumps, hydrants & Sprinkler Systems
  • FM 200 Gas Suppression System
  • CO2 Flooding system
  • Fire Detection and Alarm System
  • Vertical Turbine Type Nallah Pumps for Drainage System and Weir Gates
  • Waste Water Treatment Plant & Systems
  • Building Management System