Hazza Bin Zayed Stadium

The most modern and unique sporting venue in Al Ain, UAE.

HYDERABAD CONVENTION CENTRE

Project Highlights

Scope: Convention Centre

  • 3 X 250 TR Water Cooled Chillers with Thermal Storage of 3300 TR/Hrs
  • 14 Nos. Chilled water Pumps
  • 32 Nos. ETA Make AHUs
  • 3 Nos. Cooling Towers



Scope: Novotel

  • 3 X 150 TR Air cooled chillers with Heat Recovery
  • 3 Nos. Hot water pumps
  • 4 Nos. Chilled Water pumps
  • 34 Nos. ETA Make AHUs
  • 335 Nos. ETA Make FCUS
  • 8 Nos. Cold Storage Rooms


ABU DHABI MUNICIPALITY

Client: Abu Dhabi Municipality
Consultants: Tayeb Engg. and Bulgar Project
Main Contractor: Consolidated contractors Int’l Co. Ltd
Scope of Works: AC and Plumbing works


ADCO

Project Highlights
  • 1350 Tons Refrigeration with VAV boxes
  • Sprinkler & Fire Fighting system
  • Plumbing & Drainage system
  • Smoke Extract system
  • Power & Lighting System
  • Intelligent Fire Alarm System
  • Lighting Control System
  • Building Management System
  • Structured Cabling System
  • Clock System
  • UPS System

ADNEC

Project Highlights

BMW SHOWROOM

Project Highlights

DUBAI INTERNATIONAL CONVENTION CENTRE

Project Highlights
  • Latest State of Art Audio-Video System.
  • Fibre Optic Communication Link for Voice and Data Transfer.
  • Integrated Monitoring and Control System for High Security.
  • Stage Lighting & Simultaneous Translation Equipment.
  • Central Clock System.
  • Dubai TV, MATV, SMATV etc.

ETISALAT

Project Highlights
  • 1400 Tons of Air Conditioning
  • Power Distribution & Lighting (5 MW)
  • Standby Generator 4 x 1250 KVA
  • Fire Alarm & Fighting System with Sprinklers
  • Halon Gas System, Emergency Voice Communication System
  • Public Address System
  • Simultaneous Translation system
  • Building Management system
  • Computerised Security System with card reader & door access
  • CCTV System
  • Computer Room Air Conditioning
  • Water Supply System
  • Drainage & Sanitary Works
  • Fountain System

ETISALAT, AL AIN

Project Highlights
  • 1200 TR AC System
  • 3 x 1500 kVA Transformers
  • 2 x 1500 kVA Standby Generators
  • Close Control AC Units for Telecom Equipment area
  • Air Handling Light Troffer Diffusers
  • Automatic Inergen Gas Extinguishers System
  • Foam Deluge & Fuel Handling System
  • Automatic Sprinkler FF System
  • Liquid Detection System
  • Smoke Extract & Pressurization System
  • Waste and Storm Water Drainage System
  • Surveillance System
  • Auditorium System
  • Automatic Electrical Power Load on Demand Shedding
  • Integrated BMS
  • External Water Fountain System
  • VAVs with occupancy/time managed programs

Hazza Bin Zayed Stadium

Project Highlights

• 1,375,000 sq.ft of GI & Fire Rated Ducting
• 113 Nos. AHUs & 602 Nos. FCUs
• 350,000 sq.ft of cladding works
• 8 Km of cold cathode lighting
• 129 Access Control Doors
• 17 Km of water supply and 29 Km of drainage pipe network
• Over 4200 fire alarms in a single project


IGNCA

Client: M/s. Indira Gandhi National Centre for the Arts
Project Manager: TATA Projects Ltd.

Details of equipment involved:

  • Internal Electrification Works
  • Fire Alarm System
  • 350 TR x 4 Nos. Centrifugal (Trane Make)
  • Pumps : 19 Nos.
  • Hot Water Generator 450 KW – 2 Nos.
  • AHUs – 21 Nos.
  • Centrifugal Fans : 22 Nos.
  • Propeller Fans : 16 Nos.
  • BMS System
  • Vane Axial Fans : 11 Nos
  • Air Washers : 2 Nos.
  • Fan Coil Units : 66 Nos.
  • Electrical Panel

LUSAIL MULTIPURPOSE HALL

Project Highlights

Project Description: The Multi purpose hall project is an indoor stadium for the Hand ball, Basket ball and Volley Ball events for the world cup which will take place in 2015, The total capacity of 16000 spectators. Broadcasting facilities, Prayer rooms
PM & Consultant: M/s. Astad Project Management
Main Contractor: M/s. Consolidated Contractors Group S.A.L (Off shore ) (CCC) – Tayseer Contracting Company W.L.L.- JV
Approximate subcontractor value (MEP): QR 350 Million