Marina Mall, Abu Dhabi

A distinctive landmark of the capital, hosting more than 400 retail offerings and services

AL MANAL CENTRE

Project Highlights
  • Chilled water A/C system 600 tons
  • Treated fresh air supply
  • Fan coil units for individual shops
  • 4 nos. 1000KVA cast resin dry type
  • Transformers (air cooled)
  • Security system
  • Smoke extract system
  • Public address system
  • Building management system
  • Lighting control system
  • Fire fighting system with sprinklers
  • Fountain

BURJUMAN CENTRE

Project Highlights
  • Air Conditioning
  • Power Distribution and Lighting
  • Public Address System
  • Security System
  • Carbon Monoxide Detection
  • Smoke Extract System
  • Fire Fighting System with Sprinkler and Halan
  • Building Management System
  • Lighting Control System

DEIRA CITY CENTRE

Project Highlights
  • Airconditioning, electrical, plumbing & drainage works
  • Building management system
  • Power distribution & lighting
  • Public address system, security system, carbon monoxide detection and smoke exhaust system
  • Fire alarm system


  • Sprinkler system
  • Lighting control system
  • Escalators (4 Nos)
  • Standby generators-750 Kw each (2 Nos)
  • 33 Kv substation


DUBAI MARINA MALL & HOTEL APTS

Client: M/s. EMAAR Properties PJSC
Project Mangement: M/s. Hill International LRS
Consultant: M/s. Meinhardt (Singapore) Pte Ltd & Consulting Engineers, Planners, Managers.
Main Contractor: M/s. Al Jaber Grinaker LTA Engineering &Contg. (ALEC)

Project Highlights
  • Air Conditioning
  • Electrical – Power & Lighting
  • Building Management System
  • Fire Alarm, Voice Alarm
  • Fire Fighting System


  • Water Supply
  • Drainage System
  • LPG (Gas) System
  • CCTV System
  • Car Park Management System


GVK ONE MALL

Project Highlights
  • Installation of 1600 TR Water-Cooled Screw Chillers
  • 11 Nos. Chilled Water Pumps
  • 195 Nos. ETA Make Air Handling Units
  • 4 Nos. Condenser Water Pumps
  • 4 Nos. Cooling Towers & Exhaust Units
  • 47 Nos. Fan Coil Units and the entire low side works

KHALIDIYAH MALL

HVAC & Plumbing
  • 32 Nos. Air Handling Units
  • 194 Nos. Fan Coil Units
  • 64 Nos. Jet Ventilation Fans
  • 64 Nos. Smoke Extract /Supply Air Fans
  • 1 No. Transfer Pump Set
  • 3 Nos. Booster Pump Sets
  • 1 No. Fire Pump Set
  • FM 200 System for LV Room
  • 1 No. Electric Calorifier


Electrical
  • 1 No. 1250 KVA Generator
  • 10 Nos. Main Distribution Boards
  • 22 Nos. Lighting Control Panels
  • 1 No. Fire Alarm Panel
  • 29 Nos. BMS DDC Panels
  • CO Monitoring System for Car Park
  • 94 Nos. CCTV Cameras
  • Specialist Facade Lighting
  • Car Park Management System


MAADI CITY CENTRE

Project Highlights
  • 3 Nos. Centrifugal Water cooled chillers each of 511 TR capacity
  • 28 Nos. Air Handling Units
  • 104 Nos. Fan Coil Units
  • 4 Nos. Electrical transformers (11KV/400 V) – total capacity 7000 KVA
  • 2 Generators – each 1500 KVA complete with auto start system
  • MV (11KV) and LT panels with automatic power factor correction capacitor banks
  • Complete low current systems with Fire Alarm system, Intrusion System, Public Announcement System and Building Management System
  • Complete Fire Fighting, domestic water supply and drainage systems

Marina Mall Abu Dhabi

Project Highlights

• Over 18,000 tons of air conditioning
• Series of sub-stations catering to over 110 MW of connected load
• Over 500 smoke ventilators
• More than 850 CCTV cameras
• Over 140 Air Handling Units & 1350 Fan Coil Units


MIRDIF CITY CENTRE

Project: Mirdif City Centre
Client: M/s. Majid Al Futtaim Investment LLC
Project Management: M/s. Mace International
Main Contractor: M/s. Al Jaber Grinaker LTA Engineering & Contg. (ALEC)

HVAC
  • 6 Nos. X 2500 TR each Centrifugal Water Cooled Chillers
  • 6 Nos. Cooling Towers
  • 6 Nos. Primary CHW Pump
  • 27 Nos. Secondary CHW Pump
  • 6 Nos. Condenser Water pumps
  • 135 Nos. AHUs
  • 1345 Nos. FCUs


  • 179 Nos. Kitchen/Smoke/General Extract Fans
  • 516 Nos. Smoke Ventilators
  • 7 Nos. Ecology Units
  • 88 Nos. Air curtains
  • 11 Nos. De-aretors
  • Make up water pump for cooling towers
  • Chemical Dosing System